Kelly Bridge - Tracking the Changes

So now for some real train set building !  The tracks were roughly laid in place to enable the cut out in the board for the under-bridge to be made.  Then, the tracks went down, weathered and the testing took place.  The inner circle needed some adjustment due to the tightness of the curves and some bogie coaches not being able to traverse them.


About half a day of soldering dropper wires onto the tracks at various locations, and connecting them together underneath and running back to the control panel and we are ready for a ‘proper’ test, or at least that is how I prefer to call it rather than ‘playing trains’ !


In total, I suspect 30-40 hours were spent on wiring alone, and to give an indication, I took a picture at around a third of the way through with the track wiring and point motors in place.